ASM Modular Systems, Inc. is proud to provide three of the best practices guides to aid in the proper design and construction of an underfloor air distribution (UFAD) system. Trade specific guides have been created for the Architect, General Contractor, and Commissioning Agent extracted from lessons learned through ASM ’s experience working on a wide range of UFAD projects. These guides will help to ensure the proper sealing and reduction of underfloor air leakage in an access floor air plenum. Furthermore, ASM believes a holistic approach to design and construction should be used and recommends regular consultation be held with key individuals on the construction team throughout the entire design process.
|
|
|
An Architect’s Guide
For Detailing & Specifying
Raised Access Floor Air Plenums
This guide is designed to help an architect designing a building with a
UFAD system, provide specifications and construction details to ensure
the plenum is constructed with proper sealing to reduce underfloor air leakage.
The Architect's Guide Provides: Recommended steps to success
General Construction Specifications
Specification language for each division
Construction Sealing Details
|
|
A General Contractor’s Guide
For Constructing & Sealing
Raised Access Floor Air Plenums
The general contractor guide will aid in the coordination of subcontractors
and provide methods to ensure they are informed of, and perform to the
sealing requirements as described in the specifications and details provided
by the architect. This guide will help you ensure every contractor working in
the plenum space is aware of their responsibilities before they submit
their bids or begin construction and that they are equipped with the
information needed to successfully complete their work while maintaining
plenum integrity and reducing underfloor air leakage.
The General Contractor ’s Guide Provides: Recommended steps to success
Recommended Construction sequence
Inspection Checklist
|

Download
Commissioning
Agent's Guide
1 MB PDF |
A Commissioning Agent’s Guide
For Inspecting & Testing
Raised Access Floor Air Plenums
This guide was created to provide commissioning agents with proper
guidelines for the review, inspection, testing, and reporting of any plenum
integrity sealing deficiencies that may result in underfloor air leakage. The
recommendations contained within this guide are provided to help the
commissioning agent perform the responsibilities required to ensure
plenum integrity.
The Commissioning Agent's Guide Provides: Recommended steps to success
A plenum inspection Checklist
Definitions of types of air leakage
Air leakage test procedures
A sample test report
|